Norfolk Street Reconstruction Project
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Gray Street Reconstruction Project
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
River Street Reconstruction Project
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project.
The project includes utility and surface reconstruction of the following streets and public spaces:
• River Street from Memorial Drive to Massachusetts Avenue
• Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square)
• The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza
• Pleasant Street and Tubman Square between Pleasant Place and River Street
• Green Street between Magazine and Pearl Street
• Magazine Street between Franklin and Green Street
• Blackstone Street
In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan
• Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
|
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project.
The project includes utility and surface reconstruction of the following streets and public spaces:
• River Street from Memorial Drive to Massachusetts Avenue
• Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square)
• The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza
• Pleasant Street and Tubman Square between Pleasant Place and River Street
• Green Street between Magazine and Pearl Street
• Magazine Street between Franklin and Green Street
• Blackstone Street
In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan
• Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
|
Streets and Sidewalks
|
Current Construction
|
Elm St Reconstruction Project
Elm St Reconstruction Project
|
Elm St Reconstruction Project
|
Streets and Sidewalks
|
In Planning
|
Chetwynd Road Reconstruction Project
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Haskell Street Reconstruction Project
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Mass Ave Partial Construction
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse.
|
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse.
|
Streets and Sidewalks
|
In Planning
|
Webster Avenue
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Streets and Sidewalks
|
Current Construction
|
Harvard Square Kiosk and Plaza
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
|
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
|
Streets and Sidewalks
|
Public Works
|
Kirkland Road Reconstruction Project
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Belmont Street Reconstruction Project
Belmont Street Reconstruction Project
|
Belmont Street Reconstruction Project
|
Streets and Sidewalks
|
Current Construction
|
Shepard Street Reconstruction Project
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
|
Streets and Sidewalks
|
In Planning
|
Chestnut Street Reconstruction Project
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Current Construction
|
Park Ave Road Reconstruction Project
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
|
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
|
Streets and Sidewalks
|
Current Construction
|
Highland St Reconstruction Project
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Streets and Sidewalks
|
Completed Project
|
Franklin St. Reconstruction Project
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
|
Streets and Sidewalks
|
Current Construction
|
Mass Ave Improvements - Harvard Square
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden.
|
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden.
|
Streets and Sidewalks
|
Public Works
|
Maple Ave Reconstruction Project
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
In Planning
|
Dodge Street Reconstruction Project
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
|
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
|
Streets and Sidewalks
|
In Planning
|
Fairmont Rockwell Laurel Kelly Sidewalk and Street Improvements Project
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
|
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
|
Streets and Sidewalks
|
Current Construction
|
Centre Street and Dana Street Reconstruction Projects
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Public Works
|
Montgomery Street Reconstruction Project
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Public Works
|
Green Street Reconstruction Project
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
Public Works
|
Sciarappa St Reconstruction Project
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
|
Streets and Sidewalks
|
In Planning
|
Monsignor O'Brien Hwy Reconstruction - Phase 1 (Third St. to Gore St.)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
Streets and Sidewalks
|
Completed Project
|
Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
|
Streets and Sidewalks
|
Completed Project
|
Huron Ave Reconstruction Project
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
|
Streets and Sidewalks
|
Completed Project
|
Eliot Street Reconstruction Project
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019.
|
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019.
|
Streets and Sidewalks
|
Completed Project
|
Brewster/Riedesel Reconstruction Project
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
Streets and Sidewalks
|
Completed Project
|
Sixth Street Reconstruction Project
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan.
|
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan.
|
Streets and Sidewalks
|
Completed Project
|
Dudley Street Reconstruction Project
Dudley Street Reconstruction Project
|
Dudley Street Reconstruction Project
|
Streets and Sidewalks
|
Completed Project
|
St Mary Road Reconstruction Project
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
|
Streets and Sidewalks
|
Completed Project
|
Pearl Street Reconstruction Project
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St.
|
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St.
|
Streets and Sidewalks
|
Completed Project
|
Parker and Healey Streets
Road and Sidewalk Reconstruction
|
Road and Sidewalk Reconstruction
|
Streets and Sidewalks
|
Completed Project
|
Lawn St Reconstruction
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Streets and Sidewalks
|
Completed Project
|
Concord Ave Reconstruction
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd.
|
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd.
|
Streets and Sidewalks
|
Completed Project
|
Ellery Street Reconstruction Project
Reconstruction of Ellery Street between Cambridge St and Broadway
|
Reconstruction of Ellery Street between Cambridge St and Broadway
|
Streets and Sidewalks
|
Completed Project
|
Harvard Square Improvements Project
Includes Linden, Pympton, Dunster, and JFK St
|
Includes Linden, Pympton, Dunster, and JFK St
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 12
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave
|
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave
|
Streets and Sidewalks
|
Completed Project
|
Community Development Block Grant
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave
|
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 11
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
|
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
|
Streets and Sidewalks
|
Completed Project
|
Forest Street Reconstruction Project
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line)
|
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line)
|
Streets and Sidewalks
|
Completed Project
|
Broadway Improvements
Third Street to Ames Street
|
Third Street to Ames Street
|
Streets and Sidewalks
|
Completed Project
|
Brookline Street Reconstruction
Brookline Street Improvements (from Henry to Pacific)
|
Brookline Street Improvements (from Henry to Pacific)
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 13
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St
|
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St
|
Streets and Sidewalks
|
Completed Project
|
Chapter 90 Contract 14
Includes Linnaean St, Spring St, Davis St, Moore St
|
Includes Linnaean St, Spring St, Davis St, Moore St
|
Streets and Sidewalks
|
Completed Project
|
Main Street Reconstruction Project
Reconstruction of Main Street in Kendall Square
|
Reconstruction of Main Street in Kendall Square
|
Streets and Sidewalks
|
Completed Project
|
Cambridge Tunnel Reconstruction Project
Reconstruction of the Cambridge Tunnel and Overpass
|
Reconstruction of the Cambridge Tunnel and Overpass
|
Streets and Sidewalks
|
Completed Project
|
Fawcett Street
Reconstruction of Fawcett Street
|
Reconstruction of Fawcett Street
|
Streets and Sidewalks
|
Completed Project
|
Meacham Woodbridge Shea Locke
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street.
|
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street.
|
Streets and Sidewalks
|
Completed Project
|
Waterhouse Street
Street/ sidewalk reconstruction on Waterhouse Street.
|
Street/ sidewalk reconstruction on Waterhouse Street.
|
Streets and Sidewalks
|
Completed Project
|
Western Ave Reconstruction Project
Includes Western Ave from Green St. to Memorial Dr.
|
Includes Western Ave from Green St. to Memorial Dr.
|
Streets and Sidewalks
|
Completed Project
|
Broadway Reconstruction Project
Prospect Street to Portland Street
|
Prospect Street to Portland Street
|
Streets and Sidewalks
|
Completed Project
|
Irving Street and Scott Street
Reconstruction of Irving Street & Scott Street
|
Reconstruction of Irving Street & Scott Street
|
Streets and Sidewalks
|
Completed Project
|
Longfellow Road
Reconstruction of Longfellow Road
|
Reconstruction of Longfellow Road
|
Streets and Sidewalks
|
Completed Project
|
Mead Street Reconstruction
Reconstruction of Mead Street
|
Reconstruction of Mead Street
|
Streets and Sidewalks
|
Completed Project
|
New Street Infrastructure and Streetscape Improvements and Concord Lane Sewer Separation Project
New St from Bay State Rd to the railroad tracks and Concord Lane
|
New St from Bay State Rd to the railroad tracks and Concord Lane
|
Streets and Sidewalks
|
Completed Project
|
Tufts Street Reconstruction
Magazine Street to Pearl Street
|
Magazine Street to Pearl Street
|
Streets and Sidewalks
|
Completed Project
|
Amory Street Reconstruction
Reconstruction of Amory Street
|
Reconstruction of Amory Street
|
Streets and Sidewalks
|
Completed Project
|
Fulkerson Street Reconstruction
Cambridge Street to Charles Street
|
Cambridge Street to Charles Street
|
Streets and Sidewalks
|
Completed Project
|
Harvard Square Improvements 2015
Mt. Auburn Street from JFK Street to Holyoke Street
|
Mt. Auburn Street from JFK Street to Holyoke Street
|
Streets and Sidewalks
|
Completed Project
|
Massachusetts Avenue Reconstruction
Everett Street to Linnaean Street & Beech Street to Russell Street
|
Everett Street to Linnaean Street & Beech Street to Russell Street
|
Streets and Sidewalks
|
Completed Project
|
Richard Ave and Muller Ave
Roadway & Sidewalk Reconstruction
|
Roadway & Sidewalk Reconstruction
|
Streets and Sidewalks
|
Completed Project
|
Route 2 / Route 16 intersection
MassDOT project - scheduled to be completed Spring 2016
|
MassDOT project - scheduled to be completed Spring 2016
|
Streets and Sidewalks
|
Completed Project
|
Pleasant Street intersection at Fairmont Street Reconstruction
Pleasant Street/Fairmont Street Intersection
|
Pleasant Street/Fairmont Street Intersection
|
Streets and Sidewalks
|
Completed Project
|
Second Street Reconstruction
Rogers Street to Charles Street & Hurley Street to Gore Street
|
Rogers Street to Charles Street & Hurley Street to Gore Street
|
Streets and Sidewalks
|
Completed Project
|
Sherman Street Reconstruction
Garden Street to Walden Street
|
Garden Street to Walden Street
|
Streets and Sidewalks
|
Completed Project
|
Mt. Auburn Street Reconstruction
Gibson Street to Fresh Pond Parkway
|
Gibson Street to Fresh Pond Parkway
|
Streets and Sidewalks
|
Completed Project
|
Hayes Street Reconstruction
Roadway and Sidewalks
|
Roadway and Sidewalks
|
Streets and Sidewalks
|
Completed Project
|
Hurlbut Street Reconstruction
Sidewalks & Roadway
|
Sidewalks & Roadway
|
Streets and Sidewalks
|
Completed Project
|
Kinnaird Street Reconstruction
Reconstruction of Kinnaird Street
|
Reconstruction of Kinnaird Street
|
Streets and Sidewalks
|
Completed Project
|
Massachusetts Ave Reconstruction Project
Linnaean St to Upland Rd
|
Linnaean St to Upland Rd
|
Streets and Sidewalks
|
Completed Project
|
Thorndike Street Reconstruction Project
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
|
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
|
Streets and Sidewalks
|
Current Construction
|
Porter/Harding Streets
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Streets and Sidewalks
|
Completed Project
|
Central Square Public Toilet
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square.
|
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square.
|
Streets and Sidewalks
|
Completed Project
|
Kenwood Street
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
|
Streets and Sidewalks
|
Completed Project
|