Road being paved

City Construction Projects

Complete Streets Approach

The City of Cambridge is committed to improving the roadways, sidewalk and utilities to make them safe for all users. The construction season in Cambridge runs from mid-April through November, weather permitting. Work may be done outside of the official construction season if it doesn’t interfere with snow removal. To learn more about how City streets are prioritized for reconstruction, please visit the 5 Year Sidewalk and Street Reconstruction Plan

  • City Construction Projects- For detailed information about City construction projects, see below. You can filter for projects In Planning, In Construction or Completed. These construction projects may also be viewed as a map. You can sign up to receive email updates for any of the projects by going to the “Contact” tab of the project page.
  • University Construction Projects- Harvard University Construction information can be found here, MIT Construction Information can be found here
  • Utility Construction and Private Development Projects- For all other construction updates, including work being done by the Cambridge Water Department, Cambridge Electric Department, Eversource, other utility companies and large private development projects, click here.

Filter  
Close  
Displaying 1-76 of 76 results
Project Name & Description Description Type Status
Norfolk Street Reconstruction Project
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
Norfolk Street from Broadway to the Somerville line is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Gray Street Reconstruction Project
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
Gray Street from Martin Street to Linnaean Street is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
River Street Reconstruction Project
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project. The project includes utility and surface reconstruction of the following streets and public spaces: • River Street from Memorial Drive to Massachusetts Avenue • Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square) • The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza • Pleasant Street and Tubman Square between Pleasant Place and River Street • Green Street between Magazine and Pearl Street • Magazine Street between Franklin and Green Street • Blackstone Street In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan • Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project. The project includes utility and surface reconstruction of the following streets and public spaces: • River Street from Memorial Drive to Massachusetts Avenue • Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square) • The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza • Pleasant Street and Tubman Square between Pleasant Place and River Street • Green Street between Magazine and Pearl Street • Magazine Street between Franklin and Green Street • Blackstone Street In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan • Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road Streets and Sidewalks Current Construction
Elm St Reconstruction Project
Elm St Reconstruction Project
Elm St Reconstruction Project Streets and Sidewalks In Planning
Chetwynd Road Reconstruction Project
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
Chetwynd Road from Newell Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Haskell Street Reconstruction Project
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
Haskell Street from Rindge Ave to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Mass Ave Partial Construction
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse.
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Dudley to Beech and Roseland to Waterhouse. Streets and Sidewalks In Planning
Webster Avenue
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan. Streets and Sidewalks Current Construction
Harvard Square Kiosk and Plaza
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza. Streets and Sidewalks Public Works
Kirkland Road Reconstruction Project
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction
Kirkland Road from Kirkland Street to the end is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Belmont Street Reconstruction Project
Belmont Street Reconstruction Project
Belmont Street Reconstruction Project Streets and Sidewalks Current Construction
Shepard Street Reconstruction Project
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction
Shepard Street from Garden Street to Mass Ave is scheduled for reconstruction in 2024 as part of the City’s Five Year Plan for Street and Sidewalk Reconstruction Streets and Sidewalks In Planning
Chestnut Street Reconstruction Project
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Current Construction
Park Ave Road Reconstruction Project
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020.
Park Ave. from Huron Ave. to Holworthy St. is scheduled for improvements as part of the Five Year Street and Sidewalk Reconstruction Plan. Work is expected to begin in the Spring of 2020. Streets and Sidewalks Current Construction
Highland St Reconstruction Project
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018.
Highland St, between Appleton Street and Sparks Street, is scheduled for street and sidewalk reconstruction in 2018. Streets and Sidewalks Completed Project
Franklin St. Reconstruction Project
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018.
Franklin Street, between Pleasant Street and Landsdowne Street, is scheduled for street and sidewalk reconstruction in 2018. Streets and Sidewalks Current Construction
Mass Ave Improvements - Harvard Square
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden.
As part of the Cycling Safety Ordinance, the City is implementing separated bike lanes on Mass Ave. from Plymton to Garden. Streets and Sidewalks Public Works
Maple Ave Reconstruction Project
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks In Planning
Dodge Street Reconstruction Project
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan. Streets and Sidewalks In Planning
Fairmont Rockwell Laurel Kelly Sidewalk and Street Improvements Project
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd.
Sidewalk and Street Improvements for Fairmont Ave., Fairmont St., Rockwell St., Laurel St., Kelly Rd. Streets and Sidewalks Current Construction
Centre Street and Dana Street Reconstruction Projects
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Centre Street from Dana St. to Hancock St. and Dana Street from Cambridge Street to Mass Ave are scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Public Works
Montgomery Street Reconstruction Project
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Montgomery Street between Harvey St. and Rindge Ave. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Public Works
Green Street Reconstruction Project
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Green Street from Pearl St. to Landsdowne St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Public Works
Sciarappa St Reconstruction Project
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Sciarappa Street from Charles St. to Winter St. is scheduled for reconstruction in 2022 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks In Planning
Monsignor O'Brien Hwy Reconstruction - Phase 1 (Third St. to Gore St.)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years. Streets and Sidewalks Completed Project
Monsignor O'Brien Highway Reconstruction - Phase 2A (Lechmere Canal Outfall)
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years.
In order to develop Cambridge Crossing, DivcoWest was required to make improvements to Monsignor O’Brien Highway from Third Street to Museum Way. These improvements have included subsurface and surface infrastructure upgrades. This section of Monsignor O’Brien Highway is being transformed from a highway into a tree lined boulevard with bicycle lanes/cycle tracks, new sidewalks and significantly improved pedestrian crossings. Due to the construction associated with the MBTA’s Green Line Extension (GLX) Project, these improvements have been phased over several years. Streets and Sidewalks Completed Project
Huron Ave Reconstruction Project
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
Huron Ave, between Concord Ave. and Raymond St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan. Streets and Sidewalks Completed Project
Eliot Street Reconstruction Project
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019.
Eliot St., between JFK St. and Bennett St. is scheduled for reconstruction in 2019. Streets and Sidewalks Completed Project
Brewster/Riedesel Reconstruction Project
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
Brewster St (Appleton to Sparks) and Riedesel Ave (Brattle to Brewster) are scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan. Streets and Sidewalks Completed Project
Sixth Street Reconstruction Project
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan.
Sixth Street between Cambridge Street and Bent Street is currently scheduled for roadway work in the summer of 2018 as part of the City's 5 Year Street & Sidewalk Plan. Streets and Sidewalks Completed Project
Dudley Street Reconstruction Project
Dudley Street Reconstruction Project
Dudley Street Reconstruction Project Streets and Sidewalks Completed Project
St Mary Road Reconstruction Project
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan.
St. Mary Road, between Inman Street and Prospect Street, is scheduled for street and sidewalk reconstruction in 2018 as part of the City's 5 Year Sidewalk & Street Reconstruction Plan. Streets and Sidewalks Completed Project
Pearl Street Reconstruction Project
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St.
Reconstruction of Pearl Street from Massachusetts Avenue to Granite St. Streets and Sidewalks Completed Project
Parker and Healey Streets
Road and Sidewalk Reconstruction
Road and Sidewalk Reconstruction Streets and Sidewalks Completed Project
Lawn St Reconstruction
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway paving, sidewalk reconstruction, pedestrian ramp installations Streets and Sidewalks Completed Project
Concord Ave Reconstruction
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd.
Includes Concord Ave from Fresh Pond Parkway to Blanchard Rd. Streets and Sidewalks Completed Project
Ellery Street Reconstruction Project
Reconstruction of Ellery Street between Cambridge St and Broadway
Reconstruction of Ellery Street between Cambridge St and Broadway Streets and Sidewalks Completed Project
Harvard Square Improvements Project
Includes Linden, Pympton, Dunster, and JFK St
Includes Linden, Pympton, Dunster, and JFK St Streets and Sidewalks Completed Project
Chapter 90 Contract 12
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave
Includes Hubbard Ave, Robinson St, Cushing St, First St, Putnam Ave Streets and Sidewalks Completed Project
Community Development Block Grant
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave
Includes Elm St, Market St, Gardner Rd, Notre Dame Ave Streets and Sidewalks Completed Project
Chapter 90 Contract 11
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2
Includes Brattle St, Prospect St, Middlesex St, Cedar St, Cameron Ave, Municipal Lot #2 Streets and Sidewalks Completed Project
Forest Street Reconstruction Project
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line)
Includes Forest St, Frost St (Prentiss St to Forest St) and Oxford St (Garfield St to the Somerville line) Streets and Sidewalks Completed Project
Broadway Improvements
Third Street to Ames Street
Third Street to Ames Street Streets and Sidewalks Completed Project
Brookline Street Reconstruction
Brookline Street Improvements (from Henry to Pacific)
Brookline Street Improvements (from Henry to Pacific) Streets and Sidewalks Completed Project
Chapter 90 Contract 13
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St
Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St Streets and Sidewalks Completed Project
Chapter 90 Contract 14
Includes Linnaean St, Spring St, Davis St, Moore St
Includes Linnaean St, Spring St, Davis St, Moore St Streets and Sidewalks Completed Project
Main Street Reconstruction Project
Reconstruction of Main Street in Kendall Square
Reconstruction of Main Street in Kendall Square Streets and Sidewalks Completed Project
Cambridge Tunnel Reconstruction Project
Reconstruction of the Cambridge Tunnel and Overpass
Reconstruction of the Cambridge Tunnel and Overpass Streets and Sidewalks Completed Project
Fawcett Street
Reconstruction of Fawcett Street
Reconstruction of Fawcett Street Streets and Sidewalks Completed Project
Meacham Woodbridge Shea Locke
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street.
Street/ sidewalk reconstruction on Meacham Road, Woodbridge Street, Shea Road, Locke Street. Streets and Sidewalks Completed Project
Waterhouse Street
Street/ sidewalk reconstruction on Waterhouse Street.
Street/ sidewalk reconstruction on Waterhouse Street. Streets and Sidewalks Completed Project
Western Ave Reconstruction Project
Includes Western Ave from Green St. to Memorial Dr.
Includes Western Ave from Green St. to Memorial Dr. Streets and Sidewalks Completed Project
Broadway Reconstruction Project
Prospect Street to Portland Street
Prospect Street to Portland Street Streets and Sidewalks Completed Project
Irving Street and Scott Street
Reconstruction of Irving Street & Scott Street
Reconstruction of Irving Street & Scott Street Streets and Sidewalks Completed Project
Longfellow Road
Reconstruction of Longfellow Road
Reconstruction of Longfellow Road Streets and Sidewalks Completed Project
Mead Street Reconstruction
Reconstruction of Mead Street
Reconstruction of Mead Street Streets and Sidewalks Completed Project
New Street Infrastructure and Streetscape Improvements and Concord Lane Sewer Separation Project
New St from Bay State Rd to the railroad tracks and Concord Lane
New St from Bay State Rd to the railroad tracks and Concord Lane Streets and Sidewalks Completed Project
Tufts Street Reconstruction
Magazine Street to Pearl Street
Magazine Street to Pearl Street Streets and Sidewalks Completed Project
Amory Street Reconstruction
Reconstruction of Amory Street
Reconstruction of Amory Street Streets and Sidewalks Completed Project
Fulkerson Street Reconstruction
Cambridge Street to Charles Street
Cambridge Street to Charles Street Streets and Sidewalks Completed Project
Harvard Square Improvements 2015
Mt. Auburn Street from JFK Street to Holyoke Street
Mt. Auburn Street from JFK Street to Holyoke Street Streets and Sidewalks Completed Project
Massachusetts Avenue Reconstruction
Everett Street to Linnaean Street & Beech Street to Russell Street
Everett Street to Linnaean Street & Beech Street to Russell Street Streets and Sidewalks Completed Project
Richard Ave and Muller Ave
Roadway & Sidewalk Reconstruction
Roadway & Sidewalk Reconstruction Streets and Sidewalks Completed Project
Route 2 / Route 16 intersection
MassDOT project - scheduled to be completed Spring 2016
MassDOT project - scheduled to be completed Spring 2016 Streets and Sidewalks Completed Project
Pleasant Street intersection at Fairmont Street Reconstruction
Pleasant Street/Fairmont Street Intersection
Pleasant Street/Fairmont Street Intersection Streets and Sidewalks Completed Project
Second Street Reconstruction
Rogers Street to Charles Street & Hurley Street to Gore Street
Rogers Street to Charles Street & Hurley Street to Gore Street Streets and Sidewalks Completed Project
Sherman Street Reconstruction
Garden Street to Walden Street
Garden Street to Walden Street Streets and Sidewalks Completed Project
Mt. Auburn Street Reconstruction
Gibson Street to Fresh Pond Parkway
Gibson Street to Fresh Pond Parkway Streets and Sidewalks Completed Project
Hayes Street Reconstruction
Roadway and Sidewalks
Roadway and Sidewalks Streets and Sidewalks Completed Project
Hurlbut Street Reconstruction
Sidewalks & Roadway
Sidewalks & Roadway Streets and Sidewalks Completed Project
Kinnaird Street Reconstruction
Reconstruction of Kinnaird Street
Reconstruction of Kinnaird Street Streets and Sidewalks Completed Project
Massachusetts Ave Reconstruction Project
Linnaean St to Upland Rd
Linnaean St to Upland Rd Streets and Sidewalks Completed Project
Thorndike Street Reconstruction Project
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement.
Thorndike Street (Fulkerson St. to Third St.) Reconstruction Project includes sidewalk and roadway work as well as water main replacement. Streets and Sidewalks Current Construction
Porter/Harding Streets
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway paving, sidewalk reconstruction, pedestrian ramp installations Streets and Sidewalks Completed Project
Central Square Public Toilet
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square.
As part of the City’s Participatory Budgeting process, $320,000 in the Fiscal Year 2016 Budget was allocated for a public toilet installation in Central Square. Streets and Sidewalks Completed Project
Kenwood Street
Roadway paving, sidewalk reconstruction, pedestrian ramp installations
Roadway paving, sidewalk reconstruction, pedestrian ramp installations Streets and Sidewalks Completed Project

Will I be able to get out of my driveway or walk down the street during construction?

If any work is scheduled to be performed directly in front of your driveway, the contractor will notify you directly regarding the accessibility timeline. Pedestrian access will be maintained at all times. if you live on a road that has a bicycle lane, the contractor will try to maintain a bicycle lane around the work zone. If that is not possible, crews will post signage in the area to alert cyclists that the bicycle lane ends and to alert motorists that they should "Share the Road" with cyclists.

How can I receive updates about construction in my neighborhood?

Click on the "Sign Up" button on the Contact tab of the project page or go to cambridgema.gov/subscribe to search for mailing lists. 

Page was last modified on 3/4/2024 6:56 PM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.